It is more faster and easier to pass the IBM C9030-633 exam by using Actual IBM IBM z Systems Solutions Sales V7 questuins and answers. Immediate access to the Renovate C9030-633 Exam and find the same core area C9030-633 questions with professionally verified answers, then PASS your exam with a high score now.

2021 Nov C9030-633 free download

Q11. What ability does Custom Patterns for Linux on z Systems provide? 

A. Progressesfrom an idea to a complete  application  within  days, in order  to  develop composable business services. 

B. Manages Linux on z Systems from your z environment or a distributed environment. 

C. Improves productivity, simplify management and quickly move to a cloud environment through virtualization. 

D. Increases agility by reducing  provisioning  times  while increasing  quality through automation. 

Answer:

Reference: 

https://www-304.ibm.com/connections/files/basic/anonymous/api/library/5b9d8e8f-5808- 4fca-ab24- d61cbf7957a6/document/bb8062bc-04b6-4c6a-82ae-685ceb8cfb28/media(page 6) 


Q12. A prospective new z Systems customer is interested in anentry-levelsystem with the lowest cost application development environment. There should be options for multiple capacity settings and a small mix of specialty engines. They also have small I/O attachment requirements and very low growth requirements. Which z Systems capacity setting would be the lowest capacity starting point for the customer discussion? 

A. zBC12 A01 

B. z13 401 

C. z13 701 

D. zBC12 M01 

Answer:

Reference: 

http://www-01.ibm.com/common/ssi/ShowDoc.wss?docURL=/common/ssi/rep_ca/1/897/ENUS113- 

121/index.html&request_locale=en 


Q13. A financial company wants to improve their real-time fraud detection for ATM cash withdrawals. Theyare implementing mathematical based models to determine the fraudulent probability of every transaction. Which z13 feature should be discussed with the customer? 

A. Forward Error Correction (FEC) 

B. Single Instruction Multiple Data (SIMD) 

C. Simultaneous Multithreading (SMT) 

D. Elliptic Curve Cryptography (ECC) 

Answer:

Reference: 

http://www.redbooks.ibm.com/redpapers/pdfs/redp5145.pdf(page4) 


Q14. Which of the following IBM software products provides enhanced security for the mobile environment? 

A. z/Secure 

B. Guardium 

C. SKLM 

D. Appscan 

Answer:


Q15. A customer has a requirement to run multiple versions of z/OS on the same IBM z Systems server. Which of the following allows a customer to run multiple copies of z/OS? 

A. VMware 

B. HiperSockets 

C. PR/SM 

D. HiperDispatch 

Answer:


Updated C9030-633 exam:

Q16. A customer is comparing the z/OS Public Key Infrastructure (PKI) Services to digital certificates from an external certificate authority.  What could be done to persuade the customer to choose the IBM solution? 

A. Propose IBM GTS services to implement the solution. 

B. Demonstrate the benefits of the Cryptographic Coprocessor. 

C. Propose a Scorpion study. 

D. Propose a Proof-of-Concept to demonstrate the low CPU usage. 

Answer:


Q17. Which is the key differentiating benefit of IBM’s Mobile Workload Pricing (MWP)? 

A. It applies to peak Four Hour Rolling Average (4HRA) on all MSUs. 

B. It doesnotrequire mobile workload tracking or reporting. 

C. It is an enhancement to sub-capacity license charges. 

D. It is available on Linux on z Systems. 

Answer:


Q18. A z Systems customer wants to integrate data stored on DB2 for z/OS with external sources hosted on distributed  platforms  to  perform  business  analysis with  the  lowest  possible latency. The customer is also concerned about the costs associated with the processing of analytical workloads on z Systems. Which option satisfies the customer requirements? 

A. Offload DB2 for z/OS data to distributed platforms to avoid additional processing costs on z Systems. 

B. Offer IBM DB2 Analytics  Accelerator  for z/OS along with IBM  DB2  Analytics Accelerator Loader for z/OS. 

C. Integrate data coming from DB2 for z/OS and external sources into DB2 BLU on Linux on z Systems. 

D. Build ETL processes to extract data from external sources and integrate them with data residing on DB2 for z/OS. 

Answer:


Q19. A customerruns eight-day-long disaster recovery tests at a remote data center using disk and a CEC with minimal processing capacity. Which of the following is the most cost-effective method to provide enough processing capacity for testing purposes? 

A. Capacity for Planned Events (CPE) 

B. On/Off Capacity on Demand (OOCoD) 

C. Customer Initiated Upgrade (CIU) 

D. Capacity Backup (CBU) 

Answer:

Reference: 

http://www-304.ibm.com/services/weblectures/dlv/partnerworld/online/ltu28080/capacity%20on%20de mand.ppt(Slide 3) 


Q20. Which factor would motivate a web-based business with a large number of aging servers to move its applications to a public Cloud-based environment? 

A. Performance is better on a public Cloud. 

B. Security is enhanced when hosting on a public Cloud. 

C. Application maintenance will no longer be a problem. 

D. The customer is no longer concerned about becoming technologically obsolete. 

Answer: