Want to know Testking C2010-555 Exam practice test features? Want to lear more about IBM IBM Maximo Asset Management v7.6 Functional Analyst certification experience? Study Realistic IBM C2010-555 answers to Most recent C2010-555 questions at Testking. Gat a success with an absolute guarantee to pass IBM C2010-555 (IBM Maximo Asset Management v7.6 Functional Analyst) test on your first attempt.
♥♥ 2021 NEW RECOMMEND ♥♥
Free VCE & PDF File for IBM C2010-555 Real Exam (Full Version!)
★ Pass on Your First TRY ★ 100% Money Back Guarantee ★ Realistic Practice Exam Questions
Free Instant Download NEW C2010-555 Exam Dumps (PDF & VCE):
Available on:
http://www.surepassexam.com/C2010-555-exam-dumps.html
Q1. Which report option provides multiple access points for an end user to run reports including the toolbar shortcuts of Browser View, Direct Print. Direct Print with Attachments and direct access from application dialogs including Work Order Status Change and Inventory
A. ERI BIRT
B. Cognos
C. SQL
D. Server
Answer: B
Q2. A company needs to add the unit of measures for items, tool and services. In which application can this be done?
A. Receiving
B. Storerooms
C. Asset Templates
D. Request for Quotations
Answer: C
Q3. An Administrator needs to return a rotating asset to a vendor. When clicking on Select Rotating Assets for Return, there are no records to be returned. Why are the records missing?
A. The asset is not a rotating asset.
B. The rotating asset has not been received.
C. The rotating asset was a direct issue item.
D. The rotating asset was received and has been moved.
Answer: D
Q4. A supervisor is required to report actual work hours by work order number With which statuses can this be accomplished? {Choose two.)
A. INPRG
B. WAPPR
C. CANCEL
D. PNDREV
E. COMPLETE
Answer: A,B
Q5. A company has acquired a contract for an asset covering labor, materials and tools. What must be created to capture this information?
A. A Master Contract
B. A Warranty Contract
C. A Purchase Contract
D. A Labor Rate Contract
Answer: A
Q6. A forecast has been made for a PM. The decision has been made to delete that forecast. In
A. A reforecast is pending.
B. The forecast dates are unlocked.
C. A forecast can always be deleted.
D. The forecast dates have been locked.
Answer: D
Q7. A company wants to trigger a PM based on a characteristic type meter. How can this be accomplished?
A. Create a master PM and link to the characteristic on the Related Records tab.
B. Create a condition monitoring point and specify the PM on the upper or lower limit.
C. Create a PM against the asset and specify the meter on the Frequency tab of the PM.
D. Create an escalation based on the characteristic meter and trigger the PM via an action.
Answer: B
Q8. A company has a requirement to have labor certificates defined. In which application can this be done?
A. Crews
B. People
C. Certifications
D. Qualifications
Answer: D
Q9. An administrator has a requirement to create 44 new assets that each share a common configuration Which application can do this with a single action?
A. Assets
B. item Master
C. Classifications
D. Asset Templates
Answer: D
Q10. A company requires that laborers record the actual time they spent on a work order. The labor hours recorded are not automatically approved and the connection does not want the laborer to have access to the Work Order Tracking application.
Which application would the laborers use?
A. Invoicing
B. Time Sheets
C. Labor Reporting
D. Activities and Tasks
Answer: C