Act now and download your IBM C9030-633 test today! Do not waste time for the worthless IBM C9030-633 tutorials. Download Down to date IBM IBM z Systems Solutions Sales V7 exam with real questions and answers and begin to learn IBM C9030-633 with a classic professional.


♥♥ 2021 NEW RECOMMEND ♥♥

Free VCE & PDF File for IBM C9030-633 Real Exam (Full Version!)

★ Pass on Your First TRY ★ 100% Money Back Guarantee ★ Realistic Practice Exam Questions

Free Instant Download NEW C9030-633 Exam Dumps (PDF & VCE):
Available on: http://www.surepassexam.com/C9030-633-exam-dumps.html

Q1. A customerruns eight-day-long disaster recovery tests at a remote data center using disk and a CEC with minimal processing capacity. Which of the following is the most cost-effective method to provide enough processing capacity for testing purposes? 

A. Capacity for Planned Events (CPE) 

B. On/Off Capacity on Demand (OOCoD) 

C. Customer Initiated Upgrade (CIU) 

D. Capacity Backup (CBU) 

Answer:

Reference: 

http://www-304.ibm.com/services/weblectures/dlv/partnerworld/online/ltu28080/capacity%20on%20de mand.ppt(Slide 3) 


Q2. Which central component of IBM DB2 Analytics Accelerator architecture is responsible for data decompression,  projection  and  restriction,  providing  companies  with real-time analytical capabilities by allowing CPU’s to handle a smaller subset of data, reducing data latency andproviding faster query response times? 

A. Single Instruction Multiple Data (SIMD) 

B. Field Programmable Gate Array (FPGA) 

C. z Systems Analytical Processing Engine (zAPE) D. z Systems Integrated Information Processor  

(zIIP) 

Answer:

Reference: 

http://www.redbooks.ibm.com/redbooks/pdfs/sg248005.pdf(p.56) 


Q3. What are four types of Cloud deployment? 

A. Private Hosted Shared Public 

B. IaaS PaaS SaaS BPaaS C. IaaS Private SaaS Public 

D. SmartCloud Enterprise SmartCloud Enterprise + Managed Shared 

Answer:


Q4. Your customer has noticed that there is significantly more memory plugged in their z13 N96 than what they ordered (7072 GB), and asks for an explanation. Which of the following is an appropriate response? 

A. The IBM Configurator for e-business (e-config) will allocate approximately 10% more memory DIMMs than ordered to provide for future concurrent memory upgrades. 

B. The z13 uses RAIM (Redundant Array of Independent Memory) technology. Approximately 20% of overall DIMM capacity is used for RAIM. 

C. On a z13 additional flexible memory is installed to give customers the advantage to enable Enhanced Drawer Availability. 

D. It may be that the wrong amount of memory was configured, so we can revalidate the concurrent memory order. 

Answer:

Reference: 

https://books.google.com.pk/books?id=Do1WCAAAQBAJ&pg=PA51&lpg=PA51&dq=z13 

+uses+RAIM&source=bl&ots=5my4I- jIsM&sig=qCrlx9OBsUn2ih1ujJoBbk0iCrg&hl=en&sa=X&ved=0ahUKEwi5y6K6r7bKAh XCt4 4KHf2tBYQQ6AEIGjAA#v=onepage&q=z13%20uses%20RAIM&f=false 


Q5. Which of the following is a Continuous Availability Solution for planned and unplanned outages? 

A. GDPS / MzGM 

B. GDPS / PPRC 

C. GDPS / Global Mirror 

D. GDPS / XRC 

Answer:

Reference: 

http://www-03.ibm.com/systems/z/advantages/gdps/offerings/ 


Q6. A z/OS customer is running on a zBC12 machine and is having a batch window problem. 

Which of the following would be the bestfirststep to address this problem? 

A. Propose upgrade to new machine with faster processors. 

B. Propose technical analysis of the batch window. 

C. Propose additional memory on the zBC12. 

D. Recommend IDAA to accelerate batch processing. 

Answer:


Q7. Which of the following is a major difference between the zBC12 models 2828-H06 and 2828-H13? 

A. Model H06 has up to 6 IFLs, while the H13 has up to 13 IFLs. 

B. Model H06 can have up to 2 dedicated spares, while the H13 has 0 spares when fully configured. 

C. Model H06 can be upgraded to zEC12, while the H13 cannot. 

D. Model H06 has up to 6 general purpose CPs, while the H13 has up to 13 general purpose CPs. 

Answer:


Q8. A client is purchasing an IBM z13 server. Which implementation services are included with the normal purchase of the machine, as well as the physical installation of the server? 

A. Installation planning, I/O cable laying 

B. Floor preparation, air conditioning maintenance 

C. I/O cable laying, floor preparation 

D. Installation planning 

Answer:


Q9. Which of the following z Systems features learns the unique system characteristics of a customer’s environment, and helps to detect and diagnose unusual behavior? 

A. RDMA over Converged Ethernet (RoCE) 

B. IBM zAware 

C. zEnterprise Data Compression (zEDC) 

D. Flash Express 

Answer:


Q10. A customer is running on n-2 (two generations old) z Systems technology and still has 18 months remaining on their machine lease. There are no immediate capacity needs to do an upgrade. What would be the best action the sales specialist could take to win a sale? 

A. Present an unsolicited proposal for current technology with additional capacity as an incentive. 

B. Do a technical briefing for the customer on the new features and performance benefits of current technology. 

C. Create a business case to show technical and financial justification for an early upgrade. D. Allow the lease to get within six months of expiration before presenting a new upgrade proposal. 

Answer: