Cause all that matters here is passing the IBM C9030-633 exam. Cause all that you need is a high score of C9030-633 IBM z Systems Solutions Sales V7 exam. The only one thing you need to do is downloading Actualtests C9030-633 exam study guides now. We will not let you down with our money-back guarantee.
2021 Aug C9030-633 free practice questions
Q31. A z Systems government client is out of capacity on their installed z196. They anticipate a 10% annual growth rate in their DB2 workload over the next three years. The procurement process is complex, but they have budget money available now for a processor upgrade to z13. Unfortunately, their ongoing software costs are a concern. Which recommendation will best meet this client’s needs?
A. Purchase the capacity needed for the current workload and add the CBU feature to handle the anticipated future growth.
B. Purchase enough capacity to meet the current need and then purchase additional capacity increments later as the workload grows.
C. Purchase enough capacity to meet the anticipated future need, but activate only what is needed today. Activate the additional capacity later as the workload grows.
D. Purchase the capacity needed today and add the On/Off Capacity on Demand feature with post-paid tokens to provide the additional capacity required as the workload grows.
Answer: C
Q32. An existing z114 customer has future growth requirements, and needs to be on upgradeable technology. A sizing study indicated the customer needs a zBC12 Z03 capacity setting.
The upgrade would also include two zIIP processors and four IFLs. Which of the following would provide the growth capability and the most cost-effective model?
A. H13 to sustain additional MIPS growth and specialty engines.
B. H13 to allow growth for up to 13 z/OS CP engines.
C. HO6 to allow room for future growth for z/OS workloads.
D. H06 because it is cost effective to support the number of specialty engines.
Answer: D
Q33. A customer is interested in consolidating more of their x86 applications on z Systems. They understand the benefits, but are concerned about cost. TCA = Total cost of Acquisition TCO = Total cost of Ownership over 3 years What should the seller emphasize?
A. Although the TCO may be higher than competitors, the TCA may be lower.
B. Although TCO may be lower than competitors, the software costs may be higher.
C. Although the TCA and software costs may be lower than competitors, the energy costs may be higher.
D. Although the TCA may be higher than competitors, the TCO may be lower.
Answer: B
Q34. A new customer asks the z Systems sales professional to explain how IBM provides investment protection for their z Systems hardware. Which of the following responses is correct regarding investment protection for the hardware?
A. Latest generation z Systems processors reuse n-2 version of I/O and memory cards.
B. Applications developed for System/360 are binary-compatible with today’s z/Architecture.
C. z Systems customers can upgrade their n-2 systems to latest generation systems.
D. z Systems servers are used by more Fortune 500 customers than any other systems.
Answer: C
Q35. A customer is running z/OS 1.11 on a z196. The customer needs to upgrade to z/OS version
2.2 to support their new z13 processor which will replace the z196. Which of the following tools is used to create the software pricing for this upgrade?
A. eConfig
B. Sub-Capacity Reporting Tool
C. Workload Pricer
D. RACEv
Answer: B

Latest C9030-633 test:
Q36. IBM mobile security is designed to secure mobile devices, apps and content with:
A. IBM MobileFirst Presence Zones.
B. IBM MobileFirst Protect.
C. IBM Tealeaf CX Mobile.
D. IBM MobileFirst for iOS.
Answer: B
Reference:
http://www.ibm.com/mobilefirst/us/en/mobile-security.html
Q37. Which capability of z Systems allows it to deliver ‘extreme’ virtualization?
A. z Systems processors are more powerful than other processors.
B. z/VM supports thousands of virtual servers.
C. z Systems have many processors in a single server.
D. The hypervisor on z Systems is built into the hardware.
Answer: B
Explanation:
Consolidate and deploy thousands of virtual servers on one mainframe for extreme horizontal scalability, savings potential and resource sharing. z/VM is designed for real time provisioning of virtual servers for diverse workloads in a protected, isolated environment.
Q38. In an analytic environment, which process touches outside data sources, manipulates the data to fit operational needs, and makes the data available to the data warehouse?
A. Extract/ Transport/ Load
B. Enhance/ Transform/ Load
C. Extract/ Transform/ Load
D. Encode/ Transform/ Load
Answer: C
Q39. A client is purchasing an IBM z13 server. Which implementation services are included with the normal purchase of the machine, as well as the physical installation of the server?
A. Installation planning, I/O cable laying
B. Floor preparation, air conditioning maintenance
C. I/O cable laying, floor preparation
D. Installation planning
Answer: C
Q40. A z Systems Sales Specialist is preparing a proposal for a z196 customer for a potential system upgrade. They need to propose a z13 with 20% growth to the existing capacity. How can the seller best determine the right model for the customer?
A. Use Sales Plays to find correct model.
B. Refer to the MIPS table to find the matching model.
C. Perform capacity planning on the current machine.
D. Discuss with the customer to find out their preferred model.
Answer: C