Examcollection offers free demo for CLSSGB exam. "Certified Lean Six Sigma Green Belt (CLSSGB)", also known as CLSSGB exam, is a GAQM Certification. This set of posts, Passing the GAQM CLSSGB exam, will help you answer those questions. The CLSSGB Questions & Answers covers all the knowledge points of the real exam. 100% real GAQM CLSSGB exams and revised by experts!

Free demo questions for GAQM CLSSGB Exam Dumps Below:

NEW QUESTION 1
Hypothesis Testing can help avoid high costs of experimental efforts by using existing data.

  • A. True
  • B. False

Answer: A

NEW QUESTION 2
Which of these statements describe an undesirable situation when implementing SPC? (Note: There are 2 correct answers).

  • A. The lower Control Limit for the R chart is equal to zero
  • B. The Control Limits are wider than the customer specification limits
  • C. A process is in Statistical Control before implementation of SPC
  • D. Attempt to use SPC for tracking transaction times at a warehouse
  • E. Indication of the specification limits on the Control Chart

Answer: BE

NEW QUESTION 3
The Z score is a measure of the distance in Standard Deviations of a sample data point from the Median of the sample population.

  • A. True
  • B. False

Answer: B

NEW QUESTION 4
The Central Limit Theorem helps us understand the __________ we are taking and is the basis for using sampling to estimate population parameters.

  • A. Analysis
  • B. Kurtosis
  • C. Risk
  • D. Route

Answer: C

NEW QUESTION 5
According to the definition of Rolled Throughput Yield which of these items best describe the purpose of RTY?

  • A. A function of Y=f(x)
  • B. Accounts for losses due to rework and scrap
  • C. Isolates the increase throughput
  • D. Determines incremental Growth

Answer: B

NEW QUESTION 6
The reported Cpk for a process with an average of 94 units, a spread of 22 units and upper and lower specification limits of 125 and 80 units would be?

  • A. 0.64
  • B. 1.27
  • C. 1.84
  • D. 2.12

Answer: B

NEW QUESTION 7
Nominal Scale data consists of names, labels or categories and cannot be arranged in any mathematical ordering scheme. Complex arithmetic functions cannot be easily applied to Nominal Data:

  • A. True
  • B. False

Answer: A

NEW QUESTION 8
Long-term Data represents all the variation that one can expect within the subject process.

  • A. True
  • B. False

Answer: A

NEW QUESTION 9
A Belt concludes a Lean Six Sigma project with the creation of a Control Plan. At what point can the Control Plan be closed?

  • A. Never, a Control Plan is a living document
  • B. As soon as the Champion signs off
  • C. Within 30 days of the LSS project review team meeting
  • D. After the project has been presented at the recognition event

Answer: A

NEW QUESTION 10
Lean Enterprise is based on the premise that anywhere work is being done which of these is also occurring?

  • A. Money is being spent
  • B. Waste is being generated
  • C. People are producing value added product
  • D. Waste is being eliminated

Answer: B

NEW QUESTION 11
One of the metrics commonly used in Lean Six Sigma is DPU. This acronym stands for __________.

  • A. Deferred planned usage
  • B. Defects per unit
  • C. Decreased production utilization
  • D. Downtime per unit

Answer: B

NEW QUESTION 12
The following Business Case is constructed properly.
“During fiscal year 2008 the warranty returns for electric razor Model 312 were 1.3%. This represents a gap of 0.5% over target costing the company $18,500 per month.”

  • A. True
  • B. False

Answer: A

NEW QUESTION 13
Bias in Sampling is an error due to lack of independence among random samples or due to systematic sampling procedures.

  • A. True
  • B. False

Answer: A

NEW QUESTION 14
Significant variation in process performance is a consequence of several causes that can be classified using terminologies shown here. (Note: There are 2 correct answers).

  • A. Common
  • B. Random
  • C. Uneducated
  • D. Special
  • E. Vital

Answer: AD

NEW QUESTION 15
The reason(s) for not marking the customer Specification Limits (SL) on a Control Chart is which of these? (Note: There are 4 correct answers).

  • A. Process control teams should not control a process based on SLs
  • B. Displaying the SLs on a Control Chart sends a wrong signal toward process control
  • C. Marking the SLs on a Control Chart is against the principle of charting
  • D. By marking the SLs, one can confuse the operator as to what limits are critical
  • E. By using mere Control Limits the process only needs to be in Statistical Control

Answer: ABDE

NEW QUESTION 16
Conducting a viable Capability Analysis using Attribute Data one must obtain a fairly large sample set to be statistically sound.

  • A. True
  • B. False

Answer: A

NEW QUESTION 17
The __________ is important because it provides an estimate of the probability of an event occurring
depending on the Standard Deviation from the Mean.

  • A. Shewhart Principle
  • B. Pareto Rule
  • C. Mean/Mode Spread
  • D. Empirical Rule

Answer: D

NEW QUESTION 18
......

100% Valid and Newest Version CLSSGB Questions & Answers shared by Certleader, Get Full Dumps HERE: https://www.certleader.com/CLSSGB-dumps.html (New 200 Q&As)