Master the OG0-092 TOGAF 9 Part 2 content and be ready for exam day success quickly with this Examcollection OG0-092 free exam. We guarantee it!We make it a reality and give you real OG0-092 questions in our The-Open-Group OG0-092 braindumps.Latest 100% VALID The-Open-Group OG0-092 Exam Questions Dumps at below page. You can use our The-Open-Group OG0-092 braindumps and pass your exam.

Online OG0-092 free questions and answers of New Version:

NEW QUESTION 1
Chiamin Metals is a leading world-wide manufacturer for continuous casting and bottom pouring powders. In addition to mould powders, the company also produces cored wire for secondary metallurgy. Chiamin Metals offers a variety of products and uses a paper-based catalog to sponsor them. A new CIO has joint the enterprise and has set up a team of Enterprise Architects following the TOGAF 9 practice. The main challenge is now to offer to Chiamin Metals customers a centralized and reliable entry point for their request via the implementation of a global online portal. This will allow the management of new marketing activities and will enable the new Chiamin Metals' ecommerce service.
Refer to the scenario above
You are the Chief Architect and the CIO asked you to present an Architecture Vision to address the above business problem. Identify the best answer accordingly to the TOGAF 9.
Choose one of the following answers

  • A. You identify key stakeholders, their concerns, and define the key business requirements to be addressed in the architecture engagement and generate a Stakeholder Ma
  • B. You Evaluate business capabilities and execute a Business Transformation Readiness Assessmen
  • C. You apply the Business Scenarios technique to create a high-level view of the Baseline and Target Architectures also based on the stakeholder concerns, business capability requirements, scope, constraints, and principles.
  • D. As requested by the CIO you focus on the Architecture Vision documentation and apply the Business Scenarios technique to create a high-level view of the Baseline and Target Architectures also based on the stakeholder concerns, business capability requirements, scope, constraints, and principles.
  • E. You create a high-level view of the Target Architectures and then present them to the CIO.
  • F. As requested by the CIO you focus on the Architecture Vision and create a detailed view of the Baseline Architecture
  • G. This is done for Business, Data, Application and Technology domains and then presented to the CIO using the Architecture Definition Document.

Answer: A

NEW QUESTION 2
Dante Manufacturing is a big supplier in the automotive industry, head quarter in London with main plants in New York, Milan, Toronto and Tokio. Each one of these plants has been operating its own Manufacturing Requirements Planning (MRP II) system, production scheduling and custom applications for production automation. Dante's objective is to minimize waste production improving production operations. During an analysis of the
process improvements was determined that a significant improvement on waste production could be achieved replacing the outdated MRPII system with a common Enterprise Resource Planning (ERP) located in London. Dante has well-developed governance and processes based on TOGAF 9. The Chief Engineer of Global Manufacturing operations is the business sponsor and issued a Request for Architectural Work. The architectural activity for the implementation of the new ERP platform is kicked off and the architectural vision is produced. Some concerns on the security, reliability, responsibility and time to manage change of driving the MRP II and production scheduling by a central system located in London are raised by the team of architects working on the project and by senior management of the various organizations. These last in particular, stressed the need to align the information management with the business.
Refer to the scenario above As Lead Architect you have been asked to update the IT architectural principles to address the concerns raised by the project stakeholders and the senior management. According to TOGAF 9 (assuming the enterprise is using the example set of principles in TOGAF 9 Section 23.6), which of the following is the best answer?
Choose one of the following answers

  • A. Common Use Applications, Data is Shared, Data is Accessible, Data is Secure, Interoperability, Control, Technology Independence.
  • B. Business Continuity, Service-Orientation, Data is Shared , Data is Accessible, Data is Secure, Responsive Change Management.
  • C. Requirements-Based Change, Ease-of-Use, Data is Normalized.
  • D. Information Management is Everybody's business, IT Responsibility, Data Trustee, Technology Independence, Responsive Change Management.

Answer: D

NEW QUESTION 3
Scenario: AutoComp Corporation
AutoComp Corporation produces components for the Car industry. Driven by the global financial downturn they are looking to reduce IT costs. They believe there is a cost saving opportunity within IT but this is not quantified in terms of potential savings nor is there agreed target architecture.
Final decisions on the solutions are not yet fully agreed. They have completed their Vision Phase and first pass of the three architecture definition phases and now they want to finalize and plan their solutions. You are the Chief Architect from a consulting organization brought into review the work to date by AutoComp Corporation and to make recommendations to the CIO and the board on this.
Which of the following answers best describes how TOGAF recommends in this context?

  • A. I would determine the business value of each solution, prioritize accordingly each set of solutions, conduct detailed Risk Assessment and Mitigation, do Compliance reviews and then implement the solution
  • B. I would present my recommendations to the board for agreemen
  • C. Once this is done, I would update the architectures reflecting any changes resulting from the board discussion.
  • D. I would after confirming Enterprise Change Attributes and constraints, do a Consolidated Gap Analysis then dependencies, then group and allocate the transition
  • E. I would also assess Enterprise readiness and risks.Then I would also assess the business value of the solutions, do risk analysis with mitigation and then schedule the work products.
  • F. I would do a Consolidated Gap Analysis by considering then dependencies, then group and allocate the transition
  • G. I would then look to produce artifacts that describe the recommended projects, the risk, issues and dependencie
  • H. This would also include transition architects to move us from current architecture to the recommended target architecture
  • I. I would present my recommendations to the board for agreemen
  • J. Once this is done, I would update the architectures reflecting any changes resulting from the board discussion.
  • K. I would look at the corporate culture and attitude to change, understand the constraints such as cost and the required time horizon
  • L. I would then look at the architecture work to ensure it is complete and seek to address any gap
  • M. I would review the functional requirements and ensure there are complete interoperability requirement
  • N. I would then validate any dependencies and risk
  • O. Then formulate an implementation and migration strategy identifies major work packages and the transition architecture require
  • P. Finally, once agreement is reached with the board I will create project charters and re-factor any changes needed from the board discussion into the architecture.

Answer: D

NEW QUESTION 4
Scenario: Sollace Manufacturing
Please read this scenario prior to answering the question Sollace Manufacturing is a major supplier in the automotive industry, headquartered In Cleveland, Ohio with manufacturing plants in Chicago, Sao Paulo, Stuttgart, Yokohama, and Seoul. Each of these plants has been operating its own planning and production scheduling systems, as well as custom developed applications that drive the automated production equipment at each plant.
Sollace Manufacturing is implementing lean manufacturing principles to minimize waste and improve the efficiency of all of its production operations. During a recent exercise held for internal quality improvement, it was determined that a significant reduction in process waste could be achieved by replacing the current planning and scheduling systems with a common Enterprise Resource Planning (ERP) system located in the Cleveland data center. This central system would provide support to each of the plants replacing the functionality in the existing systems. It would also eliminate the need for full data centers at each of the plant facilities. A reduced number of IT staff could support the remaining applications. In some cases, a third-party contractor could provide those staff. The Sollace Manufacturing Enterprise Architecture department has been operating for several years and has mature, well-developed architecture governance and development processes that are strongly based on TOGAF 9. At a recent meeting, the Architecture Review Board approved a Request for Architecture Work from the Chief Engineer of Global Manufacturing Operations who is the project sponsor. The request covered the initial architectural investigations and the development of a comprehensive architecture to plan the transformation. The Common ERP Deployment architecture project team has now been formed, and the project team has been asked to develop an Architecture Vision that will achieve the desired outcomes and benefits. Some of the plant managers have expressed concern about the security and reliability of driving their planning and production scheduling from a central system located in Cleveland. The Chief Engineer wants to know how these concerns can be addressed.
Refer to the Sollace Manufacturing Scenario You are serving as the Lead Enterprise Architect for the Common ERP Deployment architecture project. One of the earliest initiatives in the Enterprise Architecture program at Sollace Manufacturing was the definition of a set of IT principles and architecture principles that are well aligned with the overall enterprise principles. These now need to be updated to address the concerns raised.
You have been asked to select a set of principles most appropriate for guiding the team to define a robust solution. [Note: You should assume that Sollace Manufacturing has adopted the example set of principles that are listed and defined in TOGAF 9, Section 23.6.] Based on TOGAF 9, which of the following is the best answer?

  • A. Common-use Applications, Data is Shared, Data is Accessible, Data Security, Interoperability, Control Technical Diversity
  • B. Business Continuity, Service-orientation, Data is Accessible, Data Security, Responsive Change Management
  • C. Maximize Benefit to the Enterprise, Business Continuity, Common-use Applications, Data is Shared, Data is Accessible, Data Security
  • D. Information Management is Everybody's Business, IT Responsibility, Data Trustee, Technology Independence, Responsive Change Management

Answer: C

NEW QUESTION 5
Carter Woods, a global furniture firm, wants to improve the efficiency of its sales force by replacing their legacy configuration and ordering systems based on manual and paper based processes with an online ordering platform.
Carter Woods uses the Architecture Delivery Method from TOGAF 9. The CIO sponsored this activity and the Baseline Architecture was defined on the initial iteration defining: approach, scope and architectural vision including a set of architecture principles related to the Data domain:
✑ Data is an asset.
✑ Data is shared.
✑ Data is accessible.
A set of aspects to clarify arose from the business analysis from the assumption to replace the legacy systems with an online centralized one. These main concerns are:
· To identify the changes to existing business processes.
· To identify the data entities that can be shared among the sales agents.
· To clarify how to keep the data secured.
· To identify the list of non-sales application to be integrated with the sales applications Refer to the scenario above
You, as Lead Enterprise Architect, need to identify the most appropriate architecture viewpoints to address the concerns above mentioned.
Choose one of the following answers

  • A. Depict the Business Architecture using a Role catalog and a Process/Event/Control/Product catalo
  • B. Depict the Data Architecture using a System/Data matrix, a Data Entity/Data Component catalog and Data Security diagra
  • C. Depict the Application Architecture using an Interface catalo
  • D. Define the Technology Architecture via a Network Computing/Hardware diagram.
  • E. Depict the Business Architecture using a Business Interaction matrix and a Location catalo
  • F. Depict the Data Architecture using a Data Lifecycle diagram and a Data Migration diagra
  • G. Depict the Application Architecture using a Software Engineering diagra
  • H. Depict the Technology Architecture using a Communications Engineering diagram.
  • I. Depict the Business Architecture using a Business Footprint diagram and a Location catalo
  • J. Depict the Data Architecture using a Data Migration diagram, System/Data matrix and Data Lifecycle diagra
  • K. Depict the Application Architecture using an Application Communication diagra
  • L. Depict the Technology Architecture using a Network Computing/Hardware diagram.
  • M. Depict the Business Architecture using a Role catalog and Location catalo
  • N. Depict the Data Architecture using a System/Data matrix, Data Entity/Business Function matrix and Data Security diagra
  • O. Depict the Application Architecture using an Application Interaction matri
  • P. Define the Technology Architecture via a Network Computing/Hardware diagram.

Answer: A

NEW QUESTION 6
Scenario: Zephyr Enterprises
Please read this scenario prior to answering the question
Zephyr Enterprises specializes in the development of wind turbine blades for use in large- scale commercial wind energy production systems. Zephyr has manufacturing facilities located in Palm Springs, California, Omaha, Nebraska, and Winnipeg, Ontario. Each of these plants supplies a different manufacturer that builds and sells complete systems. The turbine blades are custom engineered to meet each manufacturers design specifications.
Until recently, most turbine blades were fabricated manually using molded fiber-reinforced plastics. However, recent improvements in composite materials, coupled with enhanced automated methods for precision application of materials during the molding process, have led to significant reduction in weight, increase in strength, and greatly improved blade longevity. Zephyr has pioneered the development of a proprietary automated process for continuous extrusion of the turbine blades. Patents have been filed to protect the process, but certain trade secrets must be closely guarded.
Zephyr has a mature Enterprise Architecture organization that is supported by a cross- functional Architecture Review Board. The Chief Information Officer and the Chief Operating Officer co-sponsor the Enterprise Architecture program.
Zephyr has used TOGAF and its Architecture Development Method (ADM) to develop its automated manufacturing processes and systems that are used to design, manufacture, and test the blade assemblies. They have recently updated to TOGAF 9 and have adapted the Zephyr Enterprise Architecture to closely follow the TOGAF 9 framework. All of Zephyrs IT architects have been trained and certified on TOGAF 9.Recently, an architecture project was completed that defined a standard approach for controlling the Automated Test System that is used at each plant to perform final quality assurance tests on each completed blade assembly. The Manufacturing Architecture Board approved the plan for immediate implementation at each plant.
An Architecture Contract was developed that detailed the work needed to implement and deploy the new Automated Test System controller. The Chief Engineer, sponsor of the activity, has expressed concern that a uniform process be employed at each site to ensure consistency.
Refer to the Zephyr Enterprises Scenario:
You have been assigned by the Lead Architect for the Automated Test System controller project to conduct Compliance Assessments at each manufacturing plant.
During the course of the assessment at the Omaha plant, you discover that the Distributed Data Acquisition System they have purchased uses a proprietary Remote Procedure Call (RPC) that utilizes kernel mode threads instead of the user mode threads that are specified in the Architecture Definition Document. In all other respects, the system meets the requirements stated in the Architecture Definition Document and seems to perform correctly.
You have been asked to describe the compliance of this system for the final report. Based on TOGAF 9, which of the following is the best answer?

  • A. You observe that all of the features in the Architecture Definition Document have been implemented in accordance with the specification, except for the RPC mechanis
  • B. Your recommendation is that the system be described as conformant.
  • C. You observe that the system has many features in common with the Architecture Definition Document, and those features have been implemented in accordance with the specificatio
  • D. However, you note that the RPC mechanism has been implemented using features that are not covered by the specificatio
  • E. Your recommendation is that the system be described as consistent.
  • F. You observe that the implementation of the RPC mechanism has no features in common with the Architecture Definition Document, therefore the question of its conformance should not be considere
  • G. Your recommendation is that the system be described as consistent.
  • H. You observe that the system meets most of the requirements stated in the Architecture Definition Document and appears to work correctl
  • I. However, you note that the RPC mechanism has not been implemented according to the specificatio
  • J. Your recommendation is that the system be described as non-conformant.

Answer: D

NEW QUESTION 7
McKinley Rockets is an enterprise that employs 20,000 men and women in five countries: UK, Italy, France, Spain and the Netherlands and its mission is to guarantee access to space offering space transportation, launch and management of satellite systems at low cost.
A TOGAF 9 mature Enterprise Architecture program is already established within the enterprise. McKinley Rockets strategy is to leverage in the USA shortage of satellite launches availability - that NASA created because of the Shuttle program shutdown - by acquiring an important merican space agency. This will ultimately allow McKinley Rockets to offer its services to the US market. The new acquired company NovaSpace is very successful but with outdated satellite monitoring systems. The
CIO is sponsoring an activity to extend the McKinley Rockets' satellite monitoring applications to include the NovaSpace's satellites flock.
A task force of enterprise architects prepared an Architecture Vision and secured the approval. The
Architecture Board decided to approve the vision, provided that the Design Definition Document is presented
for review at phase D conclusion. Refer to the scenario above
The Chief Architect asked you as Lead Integration Architect to use TOGAF 9 to recommend the best approach to design the Full Architecture and present it to the Architecture Board.
Identify the best answer accordingly to the TOGAF 9 guidelines. Choose one of the following answers

  • A. You start with the Business Architecture and then address Technology, Application and Data domain
  • B. For every domain you select the relevant reference models, viewpoints, and tool
  • C. You develop a Target and Baseline Architecture Description
  • D. Then perform Gap Analysis, resolve impacts across the Architecture Landscape and update the roadma
  • E. Finally update the Architecture Definition Document.
  • F. You start with the Business Architecture and then address Data, Application and Technology domain
  • G. You then Confirm management framework interactions for the Implementation and Migration Plan, Prioritize the migration projects through the conduct of a cost/benefit assessment and risk validatio
  • H. Then perform GapAnalysis and update the Architecture Definition Document.
  • I. You start with the Business Architecture and then address Data, Application and Technology domain
  • J. For every domain you select the relevant reference models, viewpoints, and tool
  • K. You develop a Baseline and Target Architectur
  • L. Then perform Gap Analysis, assess the roadmap impacts and finally update the Architecture Definition Document.
  • M. You start with the Business Architecture and then address Data, Application and Technology domain
  • N. For every domain you develop a Baseline and Target Architectur
  • O. Then perform Gap Analysis and update the Architecture Definition Document.

Answer: C

NEW QUESTION 8
Scenario:
Please read this scenario prior to answering the Question
You have been assigned the role of Chief Enterprise Architect within a leading North American information technology services company. The company has a number of service portfolios including infrastructure, applications, business process outsourcing, accounting, and financial services.
With numerous practice areas and a multitude of diverse engagements underway at any given time, overall engagement management within the company has become challenging. The company does not want to risk its outstanding reputation or its international certifications and CMM ratings.
The Chief Executive Officer and Chief Information Officer have co-sponsored the creation of an Enterprise Architecture prog-am based on TOGAF 9. An Architecture Board has been formed comprised of IT staff executives and executives from the major practice areas.
The Enterprise Architecture team has been working with the Strategic Planning team to create a strategic enterprise architecture to address these issues. The team has defined a framework and held workshops with key stakeholders to define a set of architecture principles to govern the architecture work. They have completed an Architecture Vision at a strategic level and laid out Architecture Definitions for the four domains. They have set out an ambitious vision of the future of the company over a five-year period. This includes a solution architecture including three distinct transformations.
The CIO has made it clear that prior to the approval of the detailed Implementation and Migration plan, the EA team will need to assess the risks associated with the proposed architecture. He has received concerns from some of the senior partners that the proposed architecture may be too ambitious and they are not sure it can produce sufficient value to warrant the attendant risks.
Refer to the Scenario
You have been asked to recommend an approach to satisfy these concerns. Based on TOGAF 9, which of the following is the best answer?

  • A. You recommend that before preparing the detailed Implementation and Migration plan, the EA team should review and consolidate the gap analysis results from Phases B to D to understand the transformations that are required to achieve the proposed Target Architectur
  • B. The EA team should assess the readiness of the organization to undergo chang
  • C. Once the Solution Architecture has been assembled, it should be analyzed using a state evolution table to determine the Transition Architectures.
  • D. You recommend that the EA team apply an interoperability analysis to evaluate any potential issues across the Solution Architectur
  • E. This should include the development of a matrix showing the interoperability retirement
  • F. Once all of the concerns have been resolved, the EA team should finalize the Architecture Roadmap and the Implementation and Migration Plan.
  • G. You recommend that the EA team apply the Business Transformation Readiness Assessment technique which will allow the risks associated with the transformations to be identified and mitigated for, it will also identify improvement actions to be worked into the Implementation and Migration Pla
  • H. A Business Value Assessment should be used to determine the business value and associated risks for the transformation.
  • I. You recommend that the EA team should gather information about potential solutions from the appropriate source
  • J. Once the Solution Architecture has been assembled, it should be analyzed using a state evolution table to determine the Transition Architecture
  • K. A value realization process should then be established to ensure that the concerns raised are addressed.

Answer: C

NEW QUESTION 9
Magic Wand Corporation manufactures a range of equipment used by magician worldwide. The global popularity of a series of children’s books describing the formative years of a budding wizard and his various escapades at wizard school has driven unprecedented sales growth in the magical equipment market.
The current IT systems at Magic Wand are struggling to cope with the high volumes in this growth market. The CIO wants to persuade the board of Magic Wand Corporation to make a greater investment in the IT systems to cope with the new higher transaction volumes. On of the key components the CIOs wants to include when he approaches the board is a description of the current problems and how they may be addressed from an architectural point of view.
As the High Architect of Magic Wand Corporation, the CIO has delegated the task of
creating a vision for the future Architecture to you.
Which of the following answers best describes how TOGAF recommends delivering an Architecture Vision for the CIO?

  • A. Firstly, I ensure there is a Request for Architecture Work from the CI
  • B. Then I ensure that there is recognition for the architecture vision project by following any project management and programmed management frameworks used within the organizatio
  • C. I would identify the key stakeholders and engage with them to understand and document their concerns and high-level requirement
  • D. This would result in a stakeholder map used to support other deliverables such as the Architecture Vision, a Communications plan and a Statement of Architecture Wor
  • E. I would then identify the business goals and strategic drivers of the organization and define any enterprise or project specific constraints such as time and resource
  • F. I would then define the business capabilities of the organization needed to fulfill those business goals and drivers and their readiness for chang
  • G. Once complete, I would define the scope, confirm the architecture and business principles and develop the Architecture Visio
  • H. Following this, I would define the business case for the architecture project, assess the business risks and produce a risk mitigation pla
  • I. I would then define a plan of enterprise architecture work to meet the scope in the desired time line and the resources required and secure the support of stakeholders.
  • J. I would start by ensuring there is a Request for Architecture Work from the sponsor (the CIO). I would then create a project to define and deliver the architecture vision and the necessary output
  • K. The outputs include an approved Statement of Architecture Work, refined statements of Businesses Principles, Business Goals and Business Drivers, Architecture Principles, a Capability Assessment, a Tailored Architecture Framework, an Architecture vision, a Communications pla
  • L. The Statement of Architecture Work needs to be clear on the scope of architectural work, the resources needed to complete the work and amount of time it would take to complete the work assuming the scope of architectural work is agreed and that all the resources required are availabl
  • M. The final step would be to agree the Statement of Architectural Work with stakeholders confirming the scope, schedule and confirming the availability of the necessary resources.
  • N. I would start by establishing the architecture project and follow the appropriate project management metho
  • O. I would identify stakeholders their concerns and business requirements then confirm and elaborate the business goals, business drivers and constraint
  • P. I would then evaluate the business capabilities and readiness for business transformation and define the scop
  • Q. I would then develop the architecture vision, define the target architecture value proposition, KPIs and identify and mitigate all risks associated with the transformation effor
  • R. Finally, I would develop an Enterprise Architecture Plan and Statement of Work and secure approval from the relevant stakeholders.
  • S. I would approach this by defining and establishing the architecture team and governanc
  • T. This would be followed by agreeing and establishing the architecture principle
  • . I would select and customize an architecture framework changing any terminology and selecting the right phases and customizing the structure of content and outputs from the chosen metho
  • . Finally I would select and implement and architecture tool
  • . The outputs from this work would include an Organization Model for EnterpriseArchitecture, a Tailored Architecture Framework including method and content, the Architecture Principles, an initial architecture repository, restatement or references to business principles, business goals and business driver, a request for architecture work and the governance framework.

Answer: A

NEW QUESTION 10
UTrack Transports is a strong UK logistics company. The head of the strategic marketing division engaged the Principal Architect issuing a Request for architectural work to design an enhancement of the current Enterprise Data Warehouse system. An enhancement is needed to support the change in the business model; UTrack wants to leverage on customer data collected during business as usual activities and anonymize them to offer marketing agencies a fresh and accessible source of analytics data, this will increase the company revenues.
TOGAF 9 is the architectural framework in use.
Refer to the scenario above The Principal Architect has decided to ask you as Business Intelligence Subject Matter Expert to design the Data Architecture. The Chief Architect shared with you the Architecture Definition Document including the Business Architecture design. You now need to choose the artifacts you want to produce as part of the Data Architecture design. Identify the best answer accordingly to the TOGAF 9.
Choose one of the following answers

  • A. You first list the data used across the enterprise using a Data Entity/Data Component Catalog, including data entities and also the data components where data entities are store
  • B. You then classify what the data source are and the relationship with the data entities via a System/Data Matri
  • C. You finally identify common data requirements using a Data Lifecycle Diagram.
  • D. You first list the data used across the enterprise using a Data Entity/Data Component Matrix, including data entities and also the data components where data entities are store
  • E. You then classify what the data source are and the relationship with the data entities via a Role/System Catalo
  • F. You finally identify common data requirements using a Data Use Case Diagram.
  • G. You first list the data used across the enterprise using a Data Entity/Data Component Catalog, including data entities and also the data components where data entities are store
  • H. You then classify what the data source are and the relationship with the data entities via a System/Data Matrix.
  • I. You first list the data used across the enterprise using a Data Entity/Data Component Catalog, including data entities and also the data components where data entities are store
  • J. You then assign ownership of data entities to the organization via a System/Data Matrix.

Answer: A

NEW QUESTION 11
Patterns & Co. is introducing a Commercial Off-the-Shelf (COTS) Market Analytics solution in order to improve its new delivery service.
Patterns & Co. has a mature enterprise architecture capability and the CIO is the sponsor of the enterprise architecture team. The business vision and requirements for the new system are defined. It includes a detailed business process analysis. The supplier has proposed a solution but the Architecture Board identified some of the project requirements not consistent with the adopted infrastructure standards. The CIO considered the risks and approved the implementation.
The CIO has asked the EA team to execute the Phase G ensuring that the system performance KPIs are respected, the project remains within budget and security guidelines are met.
Refer to the scenario above As Lead Enterprise Architect you have to recommend a plan to implement the CIO decision. Choose the best answer according to TOGAF 9.
Choose one of the following answers

  • A. You ask the supplier to modify the web server hardware and software components so they can meet the current infrastructure standard
  • B. You advise to execute a proof of concept to anticipate any coding issu
  • C. Then, after the agreement with the development leads for supporting the development, you will provide the project plan to the project manager and develop an Architecture Contrac
  • D. A set of frequent operational reviews to monitor the solution's performance is then scheduled after the implementation is completed.
  • E. You recommend the co-existence of a second web server standard and modify the company Standards Information Base adding this new technology.You ask the project architects to create an Architecture Contract with the development team
  • F. You identify the need of a performance testing and a compliance review You agree with the business on SLA and delivery date
  • G. You identify re-usable procedures and objects.
  • H. You eliminate the non-standard web server from the solution as recommended by the Architecture Boar
  • I. You create a revised plan and Architecture Contract for the development stressing the re-use of standard technologie
  • J. You share the budget implication of this solution with a finance committee and inform the CIO of the long term cost benefits of this choic
  • K. You define periodical project management meetings to monitor compliance.
  • L. You execute a risk analysis and set deliverables and timing requirements with the development tea
  • M. You implement a detailed impact analysis of the chosen solutio
  • N. You create an Architecture Contract and ask for the CIO's approval before implementing i
  • O. You test the solution just prior to implementation and deliver the project artifacts and store after the completion of the implementation.

Answer: B