It is more faster and easier to pass the IBM C9510-820 exam by using Certified IBM Rational Team Concert V4 questuins and answers. Immediate access to the Renewal C9510-820 Exam and find the same core area C9510-820 questions with professionally verified answers, then PASS your exam with a high score now.


♥♥ 2021 NEW RECOMMEND ♥♥

Free VCE & PDF File for IBM C9510-820 Real Exam (Full Version!)

★ Pass on Your First TRY ★ 100% Money Back Guarantee ★ Realistic Practice Exam Questions

Free Instant Download NEW C9510-820 Exam Dumps (PDF & VCE):
Available on: http://www.surepassexam.com/C9510-820-exam-dumps.html

Q21. At which three levels can permissions be assigned to an individual role? (Choose three.) 

A. work item 

B. team area 

C. project area 

D. iterations 

E. server 

Answer: B,C,D 


Q22. In a project area, what defines a start and end date of a project along with an iteration breakdown? 

A. The estimated effort for all work items 

B. The product backlog 

C. the project timeline 

D. the due date for all work items 

Answer:


Q23. In an iteration plan, which value is represented by the length of the progress bar 

A. The amount of work estimated 

B. The amount of work completed 

C. The amount of work on schedule 

D. The amount of active work 

Answer:


Q24. An organization follows the Scrum process template to build a product with multiple releases. What plan type should they use to track the major goals for a specific product release? 

A. Product Backlog 

B. Release Backlog 

C. Iteration Plan 

D. Project Plan 

Answer:


Q25. In a work item comment, a practitioner types in "defect 2632". Given that there is an existing work item with the ID number 2632, which statement is true? 

A. The current comment is copied and added as a comment to "defect 2632". 

B. A parent-child relationship is created between the current work item and "defect 2632" 

C. A link to "defect 2632" is created, and a click on the link opens the corresponding work item. 

D. The content of "defect 2632" is copied into the current comment. 

Answer:


Q26. A work item appears in a plan when which two conditions are met? (Choose two.) 

A. The Filed Against field has the work item category linked to the team area that owns the plan. 

B. The Due Date field of the work item is on or before the end date of the plan. 

C. The work item is assigned to a member of the team that owns the plan. 

D. The Planned For field in the work item matches the Iteration field of the plan. 

E. The work item is created by a member of the team area that owns the plan. 

Answer: A,D 


Q27. The Jazz Team Build system can integrate with which three build or continuous integration systems? (Choose three.) 

A. Maven 

B. Hudson/Jenkins 

C. BuildForge 

D. Subversion 

E. Eclipse 

Answer: A,B,C 


Q28. A user discovers they have outgoing pending changes they did not make. What is the most 

likely explanation? 

A. Someone else delivered changes to the user's repository workspace. 

B. Someone reverted changes that the user had already accepted in their repository workspace. 

C. The team lead changed the baseline of a component on the integration stream to which the user's repository workspace delivers its changesto. 

D. A new component was added to the integration stream that the user's repository workspace delivers its changes to. 

Answer:


Q29. When does the RTC SCM detect conflicts? (Choose two.) 

A. When incoming and outgoing change sets are coming from the same user 

B. When incoming and outgoing change sets include changes to the same file 

C. When incoming and outgoing change sets include changes to the same folders 

D. When incoming and outgoing change sets are coming from two different users 

Answer: B,C 


Q30. Which two statements are true about the Team Artifacts view in the Eclipse client? (Choose two.) 

A. The view provides centralized access to team-related information and the artifacts that the viewer's team is working on. 

B. The view can be configured to only show artifacts associated with teams that the viewer is interested in. 

C. The view provides quick information about the project status and can be customized using widgets. 

D. The view tracks the repository workspaces that are in the viewer's current sandbox, and manages the viewer's change sets. 

E. The view displays the number of work items by tag attribute for a given query. 

Answer: A,B