Exam Code: C2010-651 (Practice Exam Latest Test Questions VCE PDF)
Exam Name: Fundamentals of Applying Maximo Asset Management Solutions V3 Exam
Certification Provider: IBM
Free Today! Guaranteed Training- Pass C2010-651 Exam.
2021 Apr C2010-651 Study Guide Questions:
Q11. Which industry solution based on IBM Maximo Asset Management provides the ability to record and manage smart meters?
A. IBM Maximo for Utilities
B. IBM Maximo for Government
C. IBM Maximo for Oil and Gas
D. IBM Maximo for Transportation
Answer: A
Q12. What is a valid (default-provided) option for security configuration schemes?
A. using Tivoli process automation engine (TPAE) to create users and control authorization
B. using third-party applications to create, authenticate, and authorize users
C. using TPAE to create users and using LDAP source to importsecurelygroups
D. using the LDAP application to create users and using TPAE to authenticate users
Answer: A
Q13. A customer has indicated that anybody in the company is able to complete a paper-based requisition but there are problems with these requisitions going missing from the supervisor’s desk. Which function can be used in IBM Maximo Asset Management to electronically submit requisitions in a wizard-like fashion without a lot of user training?
A. Purchase Orders
B. Desktop Requisitions
C. Purchase Requisitions
D. Requestfor Quotations
Answer: B

Up to the immediate present C2010-651 actual exam:
Q14. Which feature/function enables a manager to quickly assess the overall performance of assets?
A. The creation of Key Performance Indicators for the asset.
B. The creation of a Cognos report from IBM Maximo that provides the residual value of assets.
C. The creation of an escalation that initiates an action to start a workflow process when the status of the asset changes to Decommissioned.
D. Set the Display Downtime Report prompt in the Organization Options to On, so when the asset is in a Down status the user will be able to record the downtime.
Answer: A
Q15. If PM5 are generating automatically and the schedule needs to be stopped for a single active PM, which step is appropriate?
A. Set Adjust Next Date
B. Revise the PM with a blank date
C. Change the status to INACTIVE
D. Edit the next due date and reset the count
Answer: C
Q16. Which type of contract defines an agreement to maintain one or more assets with an outside provider?
A. Price Contract
B. Blanket Contract
C. Warrantst Contract
D. LaborRate Contract
Answer: C

Actual C2010-651 training tools:
Q17. To prepare for detailed Reliability’ Centered Maintenance (RCM) analysis, important decisions need to be made regarding the way equipment is classified from the main system to subsystem and within unit levels. This must be done in a way that is consistent with the existing maintenance strategy, tasks, routines, and levels of unit replacement. Which features and functions enable the classification and navigation through this structure?
A. Drill Down and Classification
B. Drill Down and Select Action
C. Classification and Service Catalog
D. Select Action and Service Catalog
Answer: A
Q18. What is the benefit of using the Business Intelligence Reporting Tool (BIRT) with IBM Maximo Asset Management (Maximo), compared to other reporting options?
A. The BIRT Report Engine is embedded in the Maximo application.
B. The BIRT Report Designer is embedded in the Maximo application.
C. The BIRT Report Designer is embedded in a Tivoli Common Reporting portal.
D. BIRT enables a Maximo Reporting portal built on Tivoli Common Reporting technology.
Answer: A
Q19. Which function has the ability’ to integrate with external applications through Web Services?
A. Maximo Integration Framework
B. IBM Tivoli Integration Composer
C. Maximo Integration and Solution Manager
D. IBM Tivoli Integration Service Automation Manager
Answer: A
Q20. Which task needs to be performed before Application Import/Export can be enabled?
A. Admin Mode must be turned on.
B. An Object Structure must be created of type INTEGRATION.
C. The application needs to be reconfigured in Application Designer.
D. A dedicated JMS queue must be created and linked to the APPIMPORT external system.
Answer: B