Proper study guides for Most up-to-date IBM IBM Maximo Asset Management v7.6 Functional Analyst certified begins with IBM C2010-555 preparation products which designed to deliver the Downloadable C2010-555 questions by making you pass the C2010-555 test at your first time. Try the free C2010-555 demo right now.
♥♥ 2021 NEW RECOMMEND ♥♥
Free VCE & PDF File for IBM C2010-555 Real Exam (Full Version!)
★ Pass on Your First TRY ★ 100% Money Back Guarantee ★ Realistic Practice Exam Questions
Free Instant Download NEW C2010-555 Exam Dumps (PDF & VCE):
Available on:
http://www.surepassexam.com/C2010-555-exam-dumps.html
Q11. A custom field has been added to the Work Order Tracking application to identify the inspector for environmental impacts of each work order. What type of role is used to assign the work order to the environmental inspector?
A. Person
B. Person Group
C. A set of data related to the record
D. A set of data related to the login user
Answer: A
Q12. Incorrect meter readings have been taken for gauge meters and characteristic meters. The system administrator has been asked to correct the mistake How can the meter readings be corrected?
A. Add a new meter reading In the Assets application.
B. Add the correct meter readings in the Meters application.
C. Add the correct meter readings in the Meter Reading application.
D. Add the correct meter readings In the Preventive Maintenance application.
Answer: A
Q13. A company has a requirement to report on actual labor hours, materials, services and tools used as work progresses on a work order. What is the earliest point in the basic life cycle a user can start reporting?
A. APPR
B. COMP
C. WMATL
D. WAPPR
Answer: A
Explanation: Reference: http www-01 ibm com/support/docview.wss?uid=swg21683844
Q14. A company requires that laborers record the actual time they spent on a work order. The labor hours recorded are not automatically approved and the connection does not want the laborer to have access to the Work Order Tracking application.
Which application would the laborers use?
A. Invoicing
B. Time Sheets
C. Labor Reporting
D. Activities and Tasks
Answer: C
Q15. A planner needs to combine a number of items to be used regularly that can be tracked by a single item number and issued to work orders. How can this be achieved?
A. Using an item assembly structure.
B. Transferring the necessary items to a single bin.
C. Changing the item number of each included item.
D. Updating the physical count of the inventory record.
Answer: B
Q16. Which report option provides multiple access points for an end user to run reports including the toolbar shortcuts of Browser View, Direct Print. Direct Print with Attachments and direct access from application dialogs including Work Order Status Change and Inventory
A. ERI BIRT
B. Cognos
C. SQL
D. Server
Answer: B
Q17. A maintenance planner is in the process of planning time sensitive emergency maintenance work orders for a number of assets where items need to be reserved What reservation type should be used?
A. A soft
B. Hard
C. Urgent
D. Critical
Answer: B
Q18. A forecast has been made for a PM. The decision has been made to delete that forecast. In
A. A reforecast is pending.
B. The forecast dates are unlocked.
C. A forecast can always be deleted.
D. The forecast dates have been locked.
Answer: D
Q19. A company has acquired a contract for an asset covering labor, materials and tools. What must be created to capture this information?
A. A Master Contract
B. A Warranty Contract
C. A Purchase Contract
D. A Labor Rate Contract
Answer: A
Q20. Maintenance is required on an asset at every 6,000 miles that uses job plan JP6K, and there is an additional Job Plan, JPl8K,thatis used at every 18.000 miles This Meter-Based Frequency PM has a frequency of 6,000 miles
What are the correct sequence values to use on the Job Plan Sequence tab?
A. JP6K = 1
JP18K = 2
B. JP6K=1
JP18K = 3
C. JP6K = 0
JP18K = 3
D. JP6K = 6
JP18K= 18
Answer: B