Want to know Certleader 7004 Exam practice test features? Want to lear more about Avaya Avaya Communication Server 1000 for Avaya Aura® Maintenance Exam certification experience? Study Virtual Avaya 7004 answers to Up to the minute 7004 questions at Certleader. Gat a success with an absolute guarantee to pass Avaya 7004 (Avaya Communication Server 1000 for Avaya Aura® Maintenance Exam) test on your first attempt.


♥♥ 2021 NEW RECOMMEND ♥♥

Free VCE & PDF File for Avaya 7004 Real Exam (Full Version!)

★ Pass on Your First TRY ★ 100% Money Back Guarantee ★ Realistic Practice Exam Questions

Free Instant Download NEW 7004 Exam Dumps (PDF & VCE):
Available on: http://www.surepassexam.com/7004-exam-dumps.html

New Avaya 7004 Exam Dumps Collection (Question 3 - Question 12)

New Questions 3

A company plans to use Virtual Trunk Interzone traffic. You are programming a bandwidth management zone on a Server 1000 RIs. 7 x Call Server. Which is the recommended bandwidth management strategy, assuming that bandwidth conservation is required?

A. Best Quality (BQ)

B. Bandwidth Conserve (BC)\

C. Best Bandwidth (BB)

D. Best Effort (BE)

Answer: A


New Questions 4

Click the Exhibit button.

Refer to the customeru2021s dialing plan and programming show in the exhibits.

Assuming all required Route List Indexes have been programmed, why will the station user's dialed call of 8-1-717-398-8001 not complete?

A. AC2 Access Code was not dialed

B. NPA 1717 is not provisioned in the customer's database

C. 398-8001 would be denied under the SDRR programming

D. AC1 Access Code was not dialed

Answer: C


New Questions 5

You are configuring a bandwidth management zone on a Communication Server 1000 RIs. 7 x Call Server. The Call Server zones will be used for interface communications between endpoints (IP telephones and gateways).

Which is the preferred bandwidth management strategy, assuming the network has adequate bandwidth?

A. Best Quality (BQ)

B. Best Bandwidth (BB)

C. Allocated Bandwidth (AB)

D. Best Effort (BE)

Answer: A


New Questions 6

What new prompt is added to an IP set configuration to allow for assigning a set for Zone Based Doling?

A. the ZONE prompt

B. the NUMZONE prompt

C. the DIALPLAN prompt

D. the ZBO prompt

Answer: B


New Questions 7

A company recently deployed IP telephones in its Call Center. During peak traffic conditions, callers receive an overflow tone and calls are blocked.

Zone Number = 1 Zone Intent = MO

Intrazone Traffic = Best Quality Interrone Traffic = Best Bandwidth Resource Type = Shared

Which programming change is recommended to provide dedicated Digital Signal Processor (DSP) resources to Contact Center IP telephones?

A. Change Zone Intent VTRK

B. Change Resource Type to Private

C. Change Interzone to Best Quality

D. Change Interzone Traffic to Best Bandwidth

Answer: B


New Questions 8

The Directory Number range for a customer dialing plan is 2500-2599.

Which entry indicates the number of digitals of the CDP Dialed Number (NCDP) for this dialing plan?

A. 4

B. 6

C. 8

D. 12

Answer: A


New Questions 9

Click the Exhibit button.

Given a customeru2021s Coordinating Dialing Plan shown in the exhibit, if a Station user at CDP Switch #2 dials 327-3249, which route list used and where will the call terminate?

A. Route List 2 will be utilized and the call will terminate at CDP Switch #2

B. Route List 10 will be utilized and the call will terminate at CDP Switch #3

C. Route List 5 will be utilized and the call will terminate at CDP Switch #2

D. Route List 1 will be utilized and the call will terminate at CDP Switch #3

Answer: A


New Questions 10

Click the Exhibit button.

A customer has a Communication Server 1000 RIs. 7 x system with System Manger / Unified Management (UCM) enabled. They have requested the addition of two new UCM Administrator User with the limited ability to provision telephones at each site. Refer to the exhibit for the roles current existing in the system.

Which action can the Network Administrator take to add these new accounts per the customeru2021s requirements?

A. Change the built-in MemberRegister role to add the permissions required to allow telephone configuration.

B. Assign the new users to the built-in NetworkAdministrator role because it has the permissions that allow telephone configuration.

C. Change the built-in role Patcher role to remove all permissions except those that allow telephone configuration.

D. Add a new TelephonyAdmin role with the specific permissions required to allow telephone configuration.

Answer: D


New Questions 11

With Automatic On-Net to Off-Net Overflow, if all on-net facilities such as TIE trunks between locations are busy, NARS can convert a dialed UDP number to a Listed Directory Number of the applicable DID number at that location and use off-net facilities, such as CO

trunks, to complete the call. When provisioning Automatic On-Net to Off-Net Overflow, which parameter is not correct?

A. Only one Listed Directory Number can be defined per Location Code (LOC).

B. Multiple NPAs per Location Code are allowed.

C. Multiple NXX codes per Location Code can be defined.

D. Multiple ranges of DNs within each NXX per Location Code can he defined.

Answer: D


New Questions 12

Click the Exhibit button.

Given the customeru2021s programmed database shown in the exhibit and AC 1 = 9, over which RLI will a call placed to 9-1-912-534-2222 complete?

A. RLI 9

B. RLI 4

C. RLI 3

D. RLI 2

E. call will not complete as dialed

Answer: B


Recommend!! Get the Virtual 7004 dumps in VCE and PDF From Examcollection, Welcome to download: http://www.examcollectionuk.com/7004-vce-download.html (New Q&As Version)